I’m currently migrating a project from APROL 4.2-06 to APROL 4.4-65.
Cae Backup and Restore is fine, i have some blocks modification to do but nothing big.
My problem is on Automation Studio. How can i migrate my 6 controlers from AS 4.8 to AS 6.5 ? i did not find anything about that on documentation.
Did i need to install 4.8 and 6.5 on my pc, export each project, convert it on my pc and export it back to aprol ? Is it the best and efficient way ?
Thanks for your reply.
I know that some types of PLCs are not supported, mines are good (X20CP3687X).
The message is here because on the VM i only have AS 6.5.
It’s a very APROL related question, I already see some scripts to do the conversion inside Toolkits of this community but I want to be sure that APROL authorize this or to know the correct way to do this.
I don’t know how an AS project is the same inside an APROL project or not.